Rs 900 Million Approved for Hazara Motorway Repairs
The federal government has sanctioned Rs 900 million for urgent repair work on the Hazara Motorway (E-35), following a technical evaluation that revealed multiple sections suffering from road depressions and settlement issues.
Technical Assessment Highlights Repair Needs
State Minister for Interior Muhammad Talal Chaudhry informed the Senate that detailed technical studies identified problems at approximately six to seven locations along the motorway. These assessments took into account geological conditions, such as rock stability, soil types, and topographic factors, before approving the repair budget. The initiative aims to restore affected areas to improve safety and travel quality for motorists.
Background and Project Timeline
The Hazara Motorway project was launched in 2015 and completed three years later in 2018. It underwent comprehensive feasibility studies, technical evaluations, and several inspections by independent and international experts. The two-year warranty or defect liability period expired in 2020. Nevertheless, complaints regarding pavement settlement and road depressions only surfaced in 2024, prompting government intervention.
Senate Oversight and Public Implications
Senator Mohsin Aziz raised concerns in the Senate over the motorway’s deterioration and the attendant hazards for commuters. Talal Chaudhry acknowledged the concerns but emphasized that repair operations were actively underway, requesting that they proceed without interruption. The Senate chair has also referred the issue to a relevant committee for further review.
This substantial financial commitment highlights the seriousness of the motorway’s condition beyond ordinary maintenance, with multiple damaged sections requiring extensive rehabilitation. For Pakistani drivers, how swiftly and effectively these repairs are carried out will directly impact road safety and transit efficiency on this vital infrastructure link.
Minister Talal Chaudhry underscored the government’s intent to facilitate uninterrupted and safer travel, saying, “Work on restoring the affected sections has been initiated following a thorough technical evaluation.” No detailed public timelines have yet been released concerning lane closures or phased construction schedules.
Given the Hazara Motorway’s role in facilitating commerce and connectivity in the northern region, these repairs are significant for ensuring lasting infrastructure resilience and smoother movement of goods and people, which are critical factors in Pakistan’s broader economic development.
